How Much Does Exposed Aggregate Concrete Cost on the Gold Coast?

Dion McGirr has been in the trade for over 14 years and quotes Bella Terra’s paths, slabs and pool surrounds on site, under QBCC licence 15452813. Here’s what exposed aggregate concrete costs on the Gold Coast in 2026, by job, by stone and by the sealing it needs later. It’s the exposed aggregate chapter of our Gold Coast landscaping cost guide.

Price guide
Travertine pool surround with three palms in black-edged pebble beds along a dark timber fence
A travertine pool surround with three palms in black-edged pebble beds, along a dark timber fence.
The short answer

Exposed aggregate concrete on the Gold Coast costs $120 to $195 per m², supplied and laid, typically about $155. That’s around $45 per m² more than plain concrete. A typical 40 m² exposed aggregate driveway comes to $4,700 to $8,800, and the stone blend, the job and the sealer move the price most.

Prices per m²

Exposed Aggregate Concrete Cost per m2 on the Gold Coast

Exposed aggregate costs $120 to $195 per m² on the Gold Coast, typically $155, against a typical $110 for plain concrete and $135 for coloured. The extra pays for the labour on the day: spraying, washing and cleaning the surface while the concrete is still setting.

Concrete finishes on the Gold Coast, supplied and laid, per m², from What’s The Damage, read October 2026.
FinishRangeTypical
Plain concrete$74 to $145$110
Coloured concrete$93 to $195$135
Stamped or stencilled$120 to $195$150
Exposed aggregate$120 to $195$155
New slab, mechanically polished$155 to $255$205

National guides land lower. Hipages puts exposed aggregate at $100 to $150 per m² plus labour, which is one reason two quotes for the same slab can look so far apart. Check whether a price includes the sealer before you compare.

Driveways

How Much Does an Exposed Aggregate Driveway Cost?

A typical exposed aggregate driveway of about 40 m² costs $4,700 to $8,800 on the Gold Coast, typically $6,350. The same driveway in plain concrete is $2,550 to $5,900. In Brisbane, the same guide puts a typical whole driveway at $6,500 in exposed aggregate against $4,500 in a plain broom finish.

A crew member in a Bella Terra shirt on a fresh slab pour beside a block wall
A fresh pour on one of our sites. Exposed aggregate is decided in the hours after this, while the surface is still soft enough to wash.

Removing the old slab, the base, the thickness and the council crossing all sit on top of the finish. Our concrete driveway cost guide prices those, with single and double driveways side by side.

By the job

Does Exposed Aggregate Cost More for a Path or Pool Surround?

Yes, usually. A national cost guide prices a driveway at $110 to $160 per m², garden and side paths at $120 to $180 and a pool surround at $130 to $200. Narrow paths take more edging per m², and a pool surround needs careful work against the coping, expansion joints and a slip-resistant sealer.

Exposed aggregate by the job, per m², Australia-wide, from Yakka Labour.
JobPer m²
Driveway, 40 to 80 m²$110 to $160
Patio or alfresco slab$115 to $165
Garden and side paths$120 to $180
Pool surround$130 to $200
Honed (ground) exposed aggregate$140 to $220
Exposed aggregate entry path edged in sandstone between clipped hedges, olive trees and pencil pines
An exposed aggregate entry path edged in sandstone, on one of our Benowa gardens. The stone edge is a separate line on the quote.

A path rarely stands alone. Edging it in stone or pavers, as on this Benowa entry, is priced as paving, so the quote should show the concrete and the edge as two lines.

Stone and size

What Makes Exposed Aggregate More Expensive?

The stone blend and the size of the job move the price most. A designer blend adds about $5 to $12 per m², a premium blend of white quartz, black basalt or specialty stone $12 to $25, and oxide colour in the paste $8 to $20. Small jobs often carry a minimum charge of $1,800 to $2,500.

Why a short path costs more per m²

The truck, the crew, the wash-off and the clean-up cost much the same for 8 m² as for 40 m². So on a short path the minimum charge is the price, and the rate per m² can be double a driveway’s. The concrete truck doesn’t offer a half-size.

Local stone ranges

The major suppliers sell blends made for South East Queensland. Holcim’s Geostone range has 24 decorative colours from regional Queensland stone, sold on the Gold Coast, and Boral notes that its Exposé range can vary from batch to batch. Ask to see a sample, ideally a panel of the actual mix, before choosing.

The process

How Is Exposed Aggregate Concrete Made?

Exposed aggregate is ordinary concrete with the top layer of cement paste removed so the stones show. The concrete industry lists water washing, abrasive blasting, honing and acid etching as the usual methods. On most house jobs, a retarder sprayed on the fresh slab stops the top few millimetres setting, and the crew washes that layer off once the slab beneath has set.

Cutting a stone paver to size on a wet saw
Cutting a stone paver on a wet saw. A concrete slab’s control joints are saw cut too, within hours of the pour.

Timing decides the finish. The same briefing recommends exposing no more than a third of each stone, so it stays locked in, and cutting control joints within 12 to 18 hours. The industry’s flatwork guide then recommends 7 days of curing before an acid wash.

The wash-off is a slurry of cement and fines, and it doesn’t belong in a drain. Brisbane City Council’s path drawing says the residue is to be kept out of garden beds and the stormwater system, and the same care applies on a Gold Coast job.

Pools

Is Exposed Aggregate Good Around a Pool?

It can be, with small stone. The concrete industry recommends stone no bigger than 10mm for bare feet, and calls 3 to 6mm pebbles ideal for pools. Coarser stone is generally too rough underfoot, and glassy, smooth stone may not suit a slope, where grip matters more. Big stone looks great right up to the first barefoot dash for a towel.

Looking straight down on travertine coping and paving along the edge of a pool
Travertine coping and paving along a pool, from straight above. Whatever the surround is made of, it meets the coping with a joint that lets each move.

Washed or honed

Honed exposed aggregate is ground flat, so it’s smoother on feet and costs more, at $140 to $220 per m². The concrete industry recommends at least 32 MPa concrete for a honed finish, and because it’s smoother, it needs a slip-resistant treatment where it gets wet.

Slip ratings and heat

Slip resistance is rated under AS 4586, and Brisbane’s council paths must reach class P5. No tested rating for a house pool surround in exposed aggregate is published, so ask for the result for the stone and sealer you’re buying.

Nor is there published data on how hot it gets in Gold Coast sun. A lighter stone and paste is the cautious choice, so stand barefoot on a sample on a hot afternoon. We plan the surround with the rest of the pool landscaping.

Upkeep

How Often Does Exposed Aggregate Need Sealing?

Every 2 to 7 years, depending on the sealer. A solvent-based acrylic gives a wet look and lasts 2 to 3 years on a driveway, a penetrating sealer 3 to 5 and a polyurethane 4 to 7. Hipages suggests sealing when it’s laid and every five years or so after that.

Sealers on an exposed aggregate driveway, how long each lasts and the trade cost to reapply, from Yakka Labour.
SealerLastsTo reapply
Solvent-based acrylic, wet look2 to 3 years$8 to $15 per m²
Penetrating (silane or siloxane)3 to 5 years$8 to $16 per m²
Polyurethane or hybrid4 to 7 years$15 to $30 per m²
Stripping old sealer and resealingOnce it peels or yellows$18 to $30 per m²

Hot tyres can peel a thick acrylic coat in the wheel tracks. On a driveway that sits in full sun, the cheaper sealer can end up the dearer one, because it comes off sooner and has to be stripped before the next coat.

The council

Can Exposed Aggregate Run to the Kerb on the Gold Coast?

Only with the City’s approval. The City of Gold Coast’s standard drawing for house driveways says plain concrete on the crossing gets a heavy broom finish, and decorative surfaces need council approval and a finished surface within 5mm of level. The same drawing sets a minimum concrete grade of N32 on the crossing.

The application for a standard crossing asks for a site plan that shows the surface finishes. So the finish on the crossing is settled before the pour, not on the day, and many owners simply stop the exposed aggregate at the boundary.

Who can lay it

Concreting worth more than $3,300 needs a QBCC licence in Queensland, and the concreting class covers formwork, reinforcement and concrete. We lay exposed aggregate as part of our concreting on the Gold Coast, under a Builder - Low Rise licence, QBCC 15452813.

From the field

How We Price Exposed Aggregate

Bella Terra doesn’t publish prices, because the same finish costs different money on different jobs. We price it after seeing the site: the area, the old surface, the levels and drainage, the access for the truck and what the slab sits next to. The quote is free, prepared on site and carries no obligation.

Crazy paved terrace and steps along a white two-storey home, pool beyond
A crazy paved terrace and steps along a home, the pool beyond. Concrete, paving and steps on one job are planned as one.
  1. We measure the area. The whole slab, plus the paths and strips that should go in the same pour.
  2. We check the levels. Where water runs now, and where it needs to go once the surface is sealed.
  3. We settle the stone. Size and colour for what the surface is for, with a sample to look at.
  4. We choose the sealer. For the sun, the traffic and how often you want to reseal.
  5. The quote lists every part. Removal, base, slab, finish, edging and sealer, each on its own line.

Our clients notice the finish. sam carlin summed up a Bella Terra project in five words: “Great workmanship & great value.” Linton Farrell, whose review lists driveway and path paving, wrote that we “helped us with design and constructed the full landscape to a very high standard.” You can see more finished work in the gallery.

Rectangular pool with a pale paved surround, a stacked-stone water wall and a hedged boundary
A pool with a pale paved surround and a stacked-stone water wall. The surround, the coping and the planting were planned together.

Questions

Exposed Aggregate Cost Questions

How much does exposed aggregate concrete cost?

On the Gold Coast, exposed aggregate concrete costs $120 to $195 per m² supplied and laid, typically about $155. That's around $45 per m² more than plain concrete at a typical $110. Premium stone blends, a pool surround or a honed finish push it towards the top of the range.

How much does an exposed aggregate driveway cost?

A typical exposed aggregate driveway of about 40 m² costs $4,700 to $8,800 on the Gold Coast, against $2,550 to $5,900 for the same driveway in plain concrete. Removing an old driveway and the council crossing to the road are priced on top.

Is exposed aggregate good around a pool?

It can be, with the right stone. The concrete industry recommends stone no bigger than 10mm for bare feet, with 3 to 6mm pebbles ideal for pools. Honed exposed aggregate is smoother and needs a slip-resistant treatment where it gets wet, so ask for the product's slip test result.

How often does exposed aggregate need resealing?

Every 2 to 7 years, depending on the sealer. A solvent-based acrylic lasts about 2 to 3 years on a driveway, a penetrating sealer 3 to 5 years and a polyurethane 4 to 7. Resealing by a tradesperson costs about $8 to $30 per m².

Can exposed aggregate go on the footpath crossing?

Only with the City of Gold Coast's approval. Its standard drawing for house driveways says plain concrete on the crossing gets a heavy broom finish, and decorative surfaces need council approval and a finished surface within 5mm of level. Many owners stop the exposed aggregate at the boundary.

Planning Exposed Aggregate on the Gold Coast?

Lawn and garden beds under pandanus palms, leading to a fenced pool

The figures above tell you roughly where an exposed aggregate slab lands. A site visit tells you where yours does, from the stone you like to the way the water runs.

We lay exposed aggregate as part of our concreting on the Gold Coast, for driveways, paths and pool surrounds in a garden we design and build as one team. Quotes are free, prepared on site and carry no obligation.

Get a free quote

Written by Dion McGirr, who runs Bella Terra Group and has been in the trade for over 14 years. You can talk to Dion directly about your project.