Dion McGirr has been in the trade for over 14 years and quotes Bella Terra’s decks on site, under QBCC licence 15452813. Here’s what composite decking costs on the Gold Coast in 2026, from the boards to the frame, the heat and the approval. It’s the composite chapter of our Gold Coast landscaping cost guide.

Price guide
Hardwood deck edged with an LED strip beside stone paving and an uplit yucca at dusk
A hardwood deck at dusk, edged with an LED strip, beside stone paving and an uplit yucca. A composite deck takes the same edge and lighting details.
The short answer

Composite decking on the Gold Coast costs $275 to $685 per m² installed, typically about $470, and premium capped boards run $440 to $880. The boards alone are $63 to $304 per m² in Queensland. Steps, balustrade and a high frame sit on top, so a whole deck often lands nearer $500 to $750 per m².

Prices per m²

Composite Decking Cost per m2 on the Gold Coast

Composite decking costs $275 to $685 per m² on the Gold Coast, supplied and installed, typically $470. Premium capped or solid-core boards cost $440 to $880, typically $560. At the typical rate, composite sits above merbau at $410 and level with spotted gum.

Decks on the Gold Coast, supplied and installed, per m², from What’s The Damage, read November 2026.
DeckRangeTypical
Composite, standard$275 to $685$470
Composite, premium capped or solid-core$440 to $880$560
Treated pine$175 to $345$255
Merbau$295 to $540$410
Spotted gum$345 to $590$470

National guides for composite decking cost in Australia land lower. Hipages puts a standard install at $250 to $450 or more per m², and Brite Decking at $260 to $420 in Brisbane. Those are low, simple decks. The Gold Coast range runs higher because it takes in raised decks, sloping blocks and the premium boards.

Two quotes for the same deck can look miles apart for a dull reason. One includes the steps and the old deck coming out, and the other leaves them for a nasty surprise in week two.

The boards

What Do Composite Boards Cost per Lineal Metre?

The boards in the table below cost $18 to $39 per lineal metre at retail, which works out to about $130 to $260 per m² of deck. In Queensland, a tracker of 18 board ranges puts the boards at $63 to $304 per m², with a middle price of $124. That’s the boards only, with no frame, fixings or labour.

Composite and PVC boards, average retail price across Australia inc GST, from Composite Decks, prices to 10 November 2026. Per lineal metre is the board price over its length.
BoardTypePer boardPer lmPer m²
Ekodeck Designer Series 137 × 23Wood-plastic, BAL-29$98.23 (5.4 m)$18.19$130
ModWood Natural Grain 137 × 23Wood-plastic, uncapped$110.41 (5.4 m)$20.45$145
ModWood Xtreme Guard 137 × 23Capped on all four faces$119.34 (5.4 m)$22.10$157
ModWood Flame Shield 137 × 23Fire-rated, BAL-40$144.51 (5.4 m)$26.76$190
Trex Transcend 140 × 25Capped shell$190.38 (5.48 m)$34.74$240
Eva-Last Pioneer 145 × 21PVC$213.33 (5.45 m)$39.14$259

Turning lineal metres into square metres

A 137mm board laid with ModWood’s minimum 4mm side gap covers 141mm, so a square metre of deck takes about 7.1 lineal metres of board. Add offcuts, because boards come in fixed lengths and a deck rarely does.

Corner of a hardwood deck lit by an LED strip under its edge, at dusk
The corner of a hardwood deck at dusk, lit by an LED strip under its edge. On a composite deck, that edge is a fascia board priced by the lineal metre.

Uncapped, capped, PVC and fire-rated

Uncapped wood-plastic boards are the cheapest. ModWood says its uncapped Natural Grain boards change colour in the first couple of months outdoors. Capped boards wrap the core in a tougher skin: ModWood caps Xtreme Guard on all four faces, and Trex backs its shell-capped Transcend with a 50-year residential warranty.

PVC boards contain no wood fibre and sit near the top of the price list. Fire-rated boards cost more again, and only matter where the block has a bushfire rating, covered below.

The whole deck

What Is the Deck Cost per m2 for a Whole Composite Deck?

A whole composite deck costs more per m² than the board rate, because steps, stairs, balustrade and height sit outside it. Worked from Gold Coast typical rates, a 25 m² low-set deck with three steps comes to about $12,635, or $505 per m². Raise it to 1.2 m and it’s about $18,900.

A worked 25 m² composite deck, from the typical Gold Coast rates of What’s The Damage, read November 2026. Our arithmetic.
LineWorked asTypical
25 m² of standard composite deck25 × $470$11,750
Three steps down to the lawn3 × $295$885
Low-set totalAbout $505 per m²$12,635
Same deck at 1.2 m: height surcharge25 × $98$2,450
Balustrade, 10 lineal metres10 × $275$2,750
A flight of stairs instead of stepsOne flight$1,950
High-set totalAbout $756 per m²$18,900

What sits inside the per m² rate

Hipages splits a standard install into boards at $100 to $350 per m², subframe timber at $30 to $50, fasteners at $10 to $20 and labour at $80 to $120. Hidden clips add $15 to $30 per m², and a composite fascia board $25 to $50 per lineal metre.

Hardwood deck step with an LED strip, a stone-clad planter and stone paving at dusk
A hardwood deck step at dusk, an LED strip under its nose and a stone-clad planter beside it. Every step is its own line on a quote.

What sits outside it

Steps cost $175 to $390 each on the Gold Coast, balustrade $145 to $440 per lineal metre, and a flight of stairs $980 to $4,400. Taking out an old deck adds $20 to $54 per m². None of these care whether the boards are composite or timber.

Height is the expensive one. A deck 1.2 m off the ground needs about seven risers, not the four everyone pictures from the back door, and the balustrade becomes compulsory.

The frame

Does Composite Decking Need a Different Subframe?

Often, yes. Composite boards are less stiff than hardwood, so some makers want the joists closer together. Trex allows joist centres of 400mm at most, while a typical timber decking guide allows 450mm. Closer joists mean more timber and more framing time, on the line you never see once the boards go down.

Not every board asks for it. ModWood’s 23mm boards span 450mm on a house deck, and its thicker 32mm board 600mm. The same guide asks for 300mm of ground clearance and warns against garden beds that seal off the deck’s ends, because the frame needs air moving under it.

Hardwood deck beside an uplit yucca in a stone-clad planter at dusk
A hardwood deck meeting a stone-clad planter at dusk. Where a deck meets a garden bed, the bed must leave a way for air to reach the frame.

Timber or steel

Composite boards aren’t termite food, but a timber frame is, and the QBCC says termites are a problem throughout Queensland. Treated pine joists kept off the ground need an H3 rating, and posts in the ground need H4. Brite Decking prices a treated pine frame at $30 to $45 per m² and steel at $60 to $90.

Steel ends the termite question, but the coast asks one of its own. HIA describes Z200 galvanised joists on a surf-coast house that corroded within two years and cost $30,000 to fix, where Z900 was the minimum. ModWood asks for stainless clips within 1 km of salt water and around pools.

Heat

Does Composite Decking Get Hot in Gold Coast Sun?

Yes, especially in dark colours. ModWood says a board sitting in full sun on a warm to hot day runs about 20 to 25°C above the air temperature. In Ekodeck’s own test on a clear 29°C day, its boards read 4 to 7 degrees hotter than timber of a similar colour, and the darkest board ran hottest.

Timber isn’t off the hook. In the same test, pine painted a dark Colorbond colour recorded the highest temperature of every board, and ModWood notes its own dark colours get hot underfoot like dark painted timber. Colour does more than the material.

Uplit yucca in a stone-clad planter beside a hardwood deck at dusk
An uplit yucca in a stone-clad planter beside a hardwood deck at dusk, when any board has cooled.

On a north or west-facing deck, pick the lightest colour you can live with, and plan shade from a tree or a sail. Then lay a sample in the sun for a week and stand on it barefoot at 2pm. It’s the only test where the brochure can’t argue back.

Movement

Why Does Composite Decking Need Expansion Gaps?

Composite boards grow in the heat and shrink in the cool, so they need gaps at the sides, the ends and against walls. ModWood puts the movement at about 3mm over a 5 m board for a 40°C swing, and recommends fixing boards below 25°C, out of full sun. Fix them hot and the gaps open in winter.

ModWood’s guide sets a minimum 4mm gap between boards, 2mm at a butt join and 6mm against a wall or other solid structure. Other ranges set their own, which is why the board’s guide belongs in the quote. Missing gaps show up as buckled boards in February.

Bushfire

Do You Need a Fire-Rated Composite Board?

Only if your block has a bushfire attack level, or BAL, that calls for one. The City of Gold Coast maps bushfire hazard in its City Plan, under Overlays, Bushfire hazard. On a mapped block, the BAL is worked out for the site under AS 3959, and the deck has to meet it.

ModWood Flame Shield is certified for BAL-12.5 up to BAL-40, and Ekodeck says its Designer and Summit Series are now certified BAL-29. On average retail prices, Flame Shield costs about $33 per m² more than ModWood’s capped Xtreme Guard. On a hinterland block, that’s a small price for a deck that isn’t kindling.

Bushfire-rated composite boards, the highest level each maker states and the board’s average retail price per m², from ModWood, Ekodeck and Composite Decks.
BoardCertified up toBoards per m²
ModWood Flame ShieldBAL-40$190
Ekodeck Designer SeriesBAL-29$130

Against timber

Is Composite Decking Cheaper Than Timber Over Time?

Over ten years, often, if you’d really oil the timber. Sanding and oiling a Gold Coast deck costs $24 to $59 per m² a time, and composite only needs washing. On a 24 m² deck at typical rates, composite costs about $11,280 all told, against about $14,520 for merbau oiled every second year.

Ten years on a 24 m² Gold Coast deck at typical rates, from What’s The Damage, read November 2026.
DeckTo buildUpkeepTen years
Composite$11,280Washing only$11,280
Merbau, oiled every second year$9,840About $4,680$14,520
Merbau, left to go grey$9,840None$9,840

The same guide is honest about the catch. Merbau left to go silver grey costs nothing more, and a damaged composite board gets replaced, not sanded. Our timber decking cost guide prices pine, merbau and spotted gum properly, so the two pages sit side by side.

The rules

Does a Composite Deck Need Approval in Queensland?

Usually, yes. Queensland’s Building Regulation 2021 exempts a deck only if it passes every test in the table below. The City of Gold Coast says a raised deck needs building approval from a private certifier unless it’s under 10 m², under 1.0 m high and meets all building requirements.

When a deck needs no building approval in Queensland: it must pass all five, from Building Regulation 2021, schedule 1, section 13.
TestTo be exempt
RoofNone
Floor heightNo more than 1 m above natural ground
Plan areaNo more than 10 m²
Longest sideNo more than 5 m
Wind regionNot Wind Region C (cyclone area)

The City adds fire separation rules for a deck less than 900mm from the boundary, and its own approval for a deck over 1.0 m inside a setback, which the certifier arranges. Where someone could fall 1 m or more, the building code requires a barrier at least 1 m high.

Who can build it, and the deposit

Building work worth more than $3,300 needs a QBCC licence, so nearly every composite deck does. The deposit is capped at 10% for work from $3,301 to $19,999 and 5% above $20,000. A deck beside a pool brings its own rules, covered in our pool decking guide.

From the field

How We Price a Composite Deck

Bella Terra doesn’t publish prices, because the same deck costs different money on different blocks. We price it after seeing the site: the slope, the soil for the footings, the height off the ground, the sun and how close the salt air is. It’s the same visit for every deck we build on the Gold Coast, and the quote is free, prepared on site and carries no obligation.

A Bella Terra crew member levelling travertine pavers with clips
A Bella Terra crew member levelling travertine pavers. The paving around a deck is built by the same team as the deck.

Here’s what a composite decking quote from us lists, line by line.

  1. The board. The range, the colour, and capped, PVC or fire-rated, with the maker’s guide attached.
  2. The frame. Timber or steel, the treatment or coating, and the joist centres that guide asks for.
  3. The footings. How many, how deep, and what they sit in.
  4. The fixings. Hidden clips or screws, galvanised or stainless.
  5. The edges. Fascia, gaps against the house and the air path under the deck.
  6. Steps, stairs and balustrade. Each counted and priced on its own line.
  7. Approval. Whether the deck needs it, and the certifier’s part.

Our clients notice when a quote holds. Ben Kabos wrote that “every step of the process was clear and well thought out”, and put the rest in two words, “No surprises”. We hold 5.0 from 34 Google reviews, and you can see finished work in the gallery.

Drone view of a pool with a travertine surround, palms in pebble beds and clipped hedges
A travertine pool surround from above. A deck, its paving and its planting are planned as one job.

Questions

Composite Decking Cost Questions

How much does composite decking cost?

On the Gold Coast, composite decking costs $275 to $685 per m² installed, typically about $470, and premium capped boards run $440 to $880. The boards alone cost $63 to $304 per m² in Queensland, with a middle price of $124.

What is the deck cost per m2 for a whole composite deck?

More than the board rate, because steps, balustrade and height sit outside it. At Gold Coast typical rates, a 25 m² low-set composite deck with three steps comes to about $505 per m². At 1.2 m high, with balustrade and stairs, it's about $756 per m².

Is composite decking cheaper than timber?

Not to build. Composite's typical $470 per m² on the Gold Coast sits above merbau at $410. Over ten years it can cost less, because timber needs sanding and oiling at $24 to $59 per m² a time and composite only needs washing.

Does a composite deck need approval in Queensland?

Usually, yes. A deck is exempt only if it has no roof, its floor is no more than 1 m above natural ground, its plan area is no more than 10 m², no side is longer than 5 m and it's outside Wind Region C. Anything bigger or higher needs building approval from a private certifier.

Does composite decking get too hot?

Dark boards can. ModWood says a board in full sun on a hot day sits about 20 to 25°C above the air temperature, and Ekodeck measured its boards 4 to 7 degrees hotter than timber of a similar colour. A lighter colour and some shade make the biggest difference.

Planning a Composite Deck on the Gold Coast?

Hardwood deck with an LED strip under the bench and a stone-clad planter at dusk

The figures above tell you roughly where a composite deck lands. A site visit tells you where yours does, from the frame it sits on to the colour your feet will forgive.

We build timber and composite decks for the coastal climate as part of our deck building on the Gold Coast, with the paving, planting and lighting around them in a garden we design and build as one team. We’re based in Nerang. Quotes are free, prepared on site and carry no obligation.

Get a free quote

Written by Dion McGirr, who runs Bella Terra Group and has been in the trade for over 14 years. You can talk to Dion directly about your project.

Let’s price your new deck

Free, prepared on site and with no obligation to go ahead.

Get a free quoteOr call 0423 188 691.